The construction of approximately 447 metres of DN375 PN16 PVC water main and approximately 71 metres of DN150 PN16 PE100 HDPE scour drain, including all fittings, valves, connections, cross connections and associated works using a combination of open cutting and horizontal directional drilling (HDD).