The construction of approximately 1465m of DN450 PVC-m (open trenched and trenchless), approximately 442m of DN560 HDPE (trenchless) and approximately 40m of DN457 MSCL (bridge) water main, including all fittings, valves, connections, cross connections, bridge steelwork and associated works.