MTB will use a combination of hydration excavation, open cutting and horizontal directional drilling (HDD) for the construction of the Yallourn Bypass Water Supply Main – Stage Two.
MTB will use a combination of hydration excavation, open cutting and horizontal directional drilling (HDD) for the construction of the Yallourn Bypass Water Supply Main – Stage Two.
| Project Name | GW453 Yallourn Bypass Water Supply Main |
| Contract | GW453 |
| Project Value | |
| Date | Current |